SPS PROJECT CONTROL LEADER
ACTIVITIESAssist in the definition, establishment and organization of the SPS Package team.
Using
the COMPANY Rules, DGEP/TDO/PJC Guidelines, Procedures and best work
practices, establish a set of Project and Package specific procedures to
cover the enforcement, co-ordination, control and reporting of all
Project Control activities.
Manage and oversee the consolidated review and establishment of the Contract Coordination Manual with SPS
Contractor reflecting all requirements, exigencies and best practices of the Company.
Ensure the proper implementation by SPS Contractor of the agreed procedures in particular with respect to
supply chain management and sub-contracting.
Control
the preparation and review of the initial SPS Package budget and of its
successive revisions and to oversee the constant monitoring of the SPS
package costs to record current status.
Ensure the timely control and validation of invoices presented by SPS Contractor and that cost control of the SPS package is effective and at all times up to date.
Consolidate,
control and coordinate all planning and progress measurement/control
activities associated with the establishment and management of the SPS
Package Schedule and individual
contract Work
Time Schedules. Ensure that a proper follow-up of all SPS activities is
in place in order to monitor and warrant that SPS activities are
correctly planned and performed at all times throughout the whole
duration of the project in accordance with the initial/contractual plan.
Direct own team as appropriate to maintain the SPS package schedule and be responsible for identifying with planning
engineer any areas of concern (critical path, clashes, early start, interfaces, etc…).
www.nigerianquickjobs.blogspot.com Supervise,
monitor and control SPS package contract activities comprising tender
award, preparation of contract documents and all post award contract
administration through to contract close-out.
Manage the Document
Control functions of the SPS Package and oversee any interfaces related
to Documentation Management within the Project.
Control all the
internal and external reporting of the SPS Package by enforcing timely
and continuous logging of all relevant information in order to ensure,
appropriate content and quality of information.
Preparation and
collation of the SPS weekly and monthly reports for incorporation into
the overall Egina reports, ensuring provision of detailed and accurate
input.
Ensure the preparation and collation in due time of any other
internal / external regular reports as dictated by COMPANY Rules,
Project specific or regulatory requirements.
Provide GM Egina SPS
with a clear visibility on all schedule, cost and contractual matters
for further reporting at Egina Project Management Team level.
Provide
the necessary human resources functions for and co-ordinate the
activities of the SPS Project Control Team by informing, supporting and
directing personnel in their roles, responsibilities and objectives.
The
SPS Project Control Leader has the challenging position of overseeing
all SPS Project Control positions. In managing and directing all the
Project Control functions of the SPS package, he plays a key role in
assisting the GM Egina SPS from end of CFT phase throughout execution
phase to achieve an on time and on budget delivery of a Subsea
Production System and in due compliance with the exigencies of the
COMPANY, the Affiliate and regulatory requirements.
In his day to day service, he is required to provide the right level of direction and
counseling
to each Project Control function so that the project objectives are
achieved in terms of organization, management and control of the SPS
Package Project execution.
The measure of success of this position
will be the on time and on budget delivery of the SPS Package, all in
accordance with the COMPANY Rules, DGEP/TDO/PJC Guidelines and Project
Procedures using best work practices.
The challenge of the task is
commensurate to the magnitude of schedule slippages and change orders
that have suffered the SPS EPC contracts in previous projects.
NECESSARY PROFILEFormal Education (Diplomas) : chartered engineer, degree in construction and / or management related subject
Professional Experience: 10 years with previous experience in
oil and gas industry, preferably deepwater subsea development.
Experience of contract, cost and planning administration/control (number of years): at least 5 years
English fluent.